Skip to main content

Highwood Circle Drainage Rehabilitation Project

This project is in response to a catastrophic failure of this system during the 2015 "Thousand Year Flood" where pipe collapse resulted in a 20' sink hole.  This project will replace some segments of pipe and slip line others.